Wld2013p Automatic Robot Spraying Auto Parts Electrostatic Powder / Paint Coating Production Lines with Stacking Conveyor
Contact Supplier
Product Attributes
- Customization
- Available
- After-sales Service
- After Sales Service and Others
- Warranty
- 12months
- Model NO.
- WLD2013P
- Type
- Coating Production Line
- Coating
- Powder Coating
- Substrate
- Steel
- Certification
- CE
- Condition
- New
- Heating Type
- Diesel Burner/Natural Gas/LGP/Infrared Lamp
- Port of Loading
- Guangzhou/Shenzhen Port
- Application
- Metal Coating etc
- Voltage
- 380V/415V/220V/3pH/50Hz/60Hz
- Certificate
- CE
- Color Choice
- White/Bule
- Products Capacity
- Depends on Requirements
- Working Type
- Automatic
- Transport Package
- Export Standard
- Specification
- Customized
- Trademark
- WLD
- Origin
- Guangzhou, China
- HS Code
- 8424899990
- Production Capacity
- 100 Sets Per Year
Product Images of Wld2013p Automatic Robot Spraying Auto Parts Electrostatic Powder / Paint Coating Production Lines with Stacking Conveyor
Find Similar Products
Product Description
WLD2013P Automatic Robot Spraying Auto Parts Electrostatic Powder / Paint Coating Production Lines with Stacking Conveyor:
1. Powder spraying line: hanging → degreasing spray (50-60 ºC) → clean water spray (1 min) → clean water spray (1 min) → DI (swimming immersion for 1 min) → DI spray (1 min) → DI spray cleaning (1 min) → draining section → drying (120 ºC, 8 min) → cooling (18 min) → spraying (automatic, manual repair or manual spraying) → baking and curing (180-220 ºC adjustable, 28min) → Cool down (18min) → hang down.
5. Suspension conveying system:
5.1 The heavy-duty 200 suspension conveyor chain is used, and the single-point lifting weight is 50kg, including driving mechanism, heavy hammer tensioning device, chain, straight rail, curved rail, telescopic rail, bracket, primary spreader, electrical control system, overload automatic protection device, etc. .
5.2 Adopt the appropriate number of driving devices according to the tension of each line; no problems such as crawling and jamming.
5.3 The design process chain speed is: V=0.5m/min (0.5-1.0m/min steplessly adjustable).
5.4 The drive device adopts variable frequency stepless speed regulation technology.
5.5 Displacement limit protection switches are installed on the tensioning device, catenary emergency stop switches are installed in all key parts of the whole line, and the drive is equipped with mechanical and electrical double safety protection.
5.6 All tracks are equipped with turning light wheel slewing devices to reduce the driving load.
5.7 The track in the curing furnace is equipped with 2 expansion joints to ensure that the track has no thermal deformation.
5.8 The running noise of the drive chain is below 65db, and the grease-enclosed chain is used for easy maintenance.
5.9 The upward and downward slope angles of all conveyor chains are 30º;
5.10 Set the emergency stop button at each of the following positions, and set the acousto-optic display of the emergency stop position in the conspicuous position of the workshop to promptly inform the production management personnel of the emergency stop location:
The position of the upper part; the spray booth; the powder spraying room; the driving position; the control cabinet; the position of the lower part.






FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q2. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it depends on the projects because it is customized. If your voltage is different from 380V/3PH/50Hz, the delivery time will be longer for custom-made motors or electric components.
Q5. Can you produce according to the technical drawings?
A: Yes, we can produce by your technical drawings or requirements. We can make drawings for you.
Q6: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR231393". Items marked "" are certified.
Company Profile
Guangzhou Weilongda Electromechanical Equipment Co., Ltd., which established in 2000, is one of the first and largest automobile care and maintenance equipments manufacturers and suppliers in China. It manufactures spray booths, preparation stations, auto lifts and supplies body repair systems, car wash machine, wheel alignments, tire changers, wheel balancers and other relevant garage equipment to the clients all over the world.
Quality First, Service Highest is the policy carried by all Weilongda members. Quality and safety control system is applied throughout the whole produce procedures, from design and the raw material purchasing to parts fabrication, from welding to painting, from the product's factory assembling to packing and loading. All the products are produced strictly according to ISO9001: 2008 systems and CE standards.
After years of investment and management, WEILONGDA is a famous brand now. It enjoys high reputations among domestic customers as well as clients from England, Ireland, Poland, Sweden, Russia, Nigeria, Ghana, South Africa, America, Australia, Japan and other Asian countries.
Please feel free to contact members of Weilongda and start a happy and win-win cooperation.
With your join, the future is better.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- Dongxiu Road, Gangkou Industrial Zone, Xinhua Town, Huadu District, Guangzhou, Guangdong, China
-
Plant Area
- 11000 square meters
-
Terms of Payment
- LC, T/T, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shenzhen Port, Guangzhou Port
Our Production Capability & Technical Expertise
- Main Products
- Spray Paint Booth, Powder Coating Line, Prep Station, Auto Lifter, Air Compressor, Car Frame Machine, Wheel Balancer, Wheel Alignment, Auto Repair Equipment, Tire Changer
-
Production Machines
- Cutting Machine, Bending Machine, Electric Welding Machine, Press Machine, Spraying Line, Automatic Spraying Line
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 3 people
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2000-03-09
- Export Year
- 2005-07-01
-
Main Markets
- North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
-
Number of Foreign Trading Staff
- 9
-
Overseas Agent/Branch
- No
Our Certifications, Standards & Industry Recognition
-
Product Certification
- CE
Send your message to this supplier
People who viewed this also viewed
-
US$10,000.00-20,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Coating Machine
- Wld2013p Automatic Robot Spraying Auto Parts Electrostatic Powder / Paint Coating Production Lines with Stacking Conveyor
Related Categories
Hot Searches
- Coating Machine Factories
- Powder Material Factories
- Coating Equipment Factories
- Powder Coating Machine Factories
- Industrial Powder Coating
- Powder Coating Production Line
- Industrial Powder Coating Equipment
- Powder Coating Line Equipment
- Powder Coating Machine Line
- Powder Coating Equipment Bulkbuy