Wld-PS-C3 Prep Station/Preparation Station/Preparation Bay for Car Refinish
Contact Supplier
Product Highlights
- CE Certified Safety: Approved by CE certification for safe operation in automotive refinish environments.
- 1-Year Warranty: Comprehensive 12-month warranty coverage for all mechanical defects and parts.
- Customizable Dimensions: External size 7500x3550x3480mm and internal size 6300x3500x2700mm available.
- Low Noise Operation: Siemens technology fans with rock wool sound proof cover for quiet performance.
- Durable Powder Coating: All components feature powder coating treatment for strong anti-rust finishing.
- Advanced Control System: Digital pressure display, over-heat alarm, and intuitive operation status monitoring.
Product Attributes
- Customization
- Available
- After-sales Service
- After Sales Service and Others
- Warranty
- 12months
- Model NO.
- Wld-PS-C3
- Type
- Spray Booth
- Certification
- CE
- Substrate
- PVC
- Brand
- Weilongda
- Coating
- Powder Coating
- Airflow Direction
- Cross-flow Type
- Heating Mode
- Diesel
- Paint Mist Treatment
- Dry-type
- Condition
- New
- External Size
- 7500*3550*3480mm
- Internal Size
- 6300*3500*2700mm
- Air Speed
- >=0.2-0.3m/S
- Transport Package
- Export Standard
- Specification
- Standard Type
- Trademark
- WeiLongDa
- Origin
- Guangzhou, China
- HS Code
- 84198990
- Production Capacity
- 4, 000 PCS/Year
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Wld-PS-C3 Prep Station/Preparation Station/Preparation Bay for Car Refinish
Find Similar Products
Product Description
1. CE certificate Approved Preparation station
2. Exhausted air from the basement
3. Real preparation station manufactorer in China
4. 1 year warranty
5. High quality and best service.
| External Size | 7500× 3550× 3480mm(L× W× H) |
| Internal Size | 6300× 3500× 2700mm(L× W× H) |
| Plenum Dimension | 6300× 3450× 400mm(L× W× H) |
| Basement | 300mm galvanized steel basement, full grilles made by flat bar and round steel then galvanized. 2 ramps, external setting, 2000× 750mm(L× W), surface is powder coating |
| Room Body | Back side with 50mm EPS wall panels, the other 3 sides with PVC curtains |
| Lighting System | Ceiling lights 8units × 4pcs=32pcs 36W, 800Lux |
| Intake and Exhaust System | 5.5KW double intake centrifugal fan for intake air, 5.5KW double intake centrifugal fan for exhaust air, air capacity is 15500 m 3 /h. With manual damper for exhaust air |
| Heating System | RIELLO G10 burner, Max. heating productivity: 100000 Kcal/h. Max. Working Temperature 25 o C |
| Filtering System | Pre-filter, high efficiency filter, exhaust fiberglass filter |
| Control System | Fan operation switch, lighting switch, temperature controller, emergency stop |
| Total Power | 12.2 KW |
| Generator Setting | Exhaust air from rear side, powder coating treatment |
| Setting Style | Suspending steel hook from roof of building or steel column supporting |








FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q2. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
Q5. Can you produce according to the technical drawings?
A: Yes, we can produce by your technical drawings or requirements. We can make drawings for you.
Q6: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q7: Why choose WeiLongDa?
A1. Wallboard - All WLD spray booth wall panels are anti-fire EPS,foam density is 14kg/m²;
A2. Front door - with aluminum view window, made of 50mm EPS, 0.8mm galvanized steel with plastic spray. Front door is like a face, beautiful, strong, practical, leakproof, anti-rusting & long-lasting, it means your workshop will attract more business and you will spend less time and money on spray booth maintenance;
A3. Steel structure - 4000kg vehicle can safely get in and out of the booth without worried, no noise, vibration is minimized, no air leakage, dust free, clean and efficient, we use thick galvanized steel pipes to make our spray booth cabinet, so our cabinet is anti-rusting;
A4. Heat exchanger - 2 layers radia pipes structure with 2 wings welded by experienced skillful welder, it is high efficiency & safe;
A5. Motor fan - introduced from Simens technology with large air flow at low noise, high quality bearing, full cooper coils, rock wool sound proff cover;
A6. Components finishing - since Weilongda factory has its own powder coating facility, all components seen were with powder coated treatment. Strong anti-rusting finishing, not just good looking but also make a durable spray booth.
A7. Advantages of Weilongda control panel - 1) dust free 2) user can intuitively see the booth actual operation status from the panel 3) spray temperature and baking temperature were set in internal memory, no need to reset temperature when change the mode 4) digital pressure display with over pressure alarm 5) over heat fire alarm system 6) we offer 1 year warranty, life-long maintenance for our booth;
A8. Small details - 1) hinge type ceiling filter frame, one person can handle changing filter 2) flter is self sealing no need screw to fix 3) fan filter is easy to access with small door and handle 4) front door locking pin with position locking 5) infrared lamp with rock wool isolation 6) infrared lamp install with isolation distance 7) infrared lamp with door open security sensor switch 8) infrared lamp with wire entrance prastic screw.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR231393". Items marked "" are certified.
Company Profile
Guangzhou WLD Equipment Co., Ltd., established in 2000 and located in Huadu District, Guangzhou, only 30 minutes drive from Baiyun International Airport, is one of the leading manufacturers and suppliers of automobile care and industrial coating equipment.
The factory covers an area of around 18, 000 square meters. It specializes in manufacturing spray booths, powder coating lines, prep bays, and supplying air compressors, sandblasting machines, auto lifts, car body repair systems and other garage equipment to clients worldwide. A strict quality and safety control system is implemented throughout the entire production process, from design and raw material procurement to parts fabrication, welding, coating, factory assembly, packing and loading. All products are manufactured in strict accordance with ISO9001: 2015 and CE standards.
We uphold our business philosophy: "Integrity as Foundation, Pursuit of Excellence; Survival through Quality, Customer First". With over two decades of dedication to industrial coating equipment, we focus on quality and customer needs. Our products are well-received domestically and exported to Europe, the Americas, Australia, the Middle East, Southeast Asia, Africa and beyond.
Going forward, leveraging our strong financial strength and efficient management system, we will continue to provide customers with high-quality, cost-effective products and services while improving our global sales and after-sales networks. WLD looks forward to creating a brilliant future together with you.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- Dongxiu Road, Gangkou Industrial Zone, Xinhua Town, Huadu District, Guangzhou, Guangdong, China
-
Plant Area
- 11000 square meters
-
Terms of Payment
- LC, T/T, Western Union, Small-amount payment
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays -
Nearest Port
- Shenzhen Port, Guangzhou Port
Our Production Capability & Technical Expertise
- Main Products
- Spray Paint Booth, Powder Coating Line, Prep Station, Auto Lifter, Air Compressor, Car Frame Machine, Wheel Balancer, Wheel Alignment, Auto Repair Equipment, Tire Changer
-
Production Machines
- Cutting Machine, Bending Machine, Electric Welding Machine, Press Machine, Spraying Line, Automatic Spraying Line
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 3 people
-
Own Brand
- Yes
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2000-03-09
- Export Year
- 2005-07-01
-
Main Markets
- North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia
-
Number of Foreign Trading Staff
- 9
-
Overseas Agent/Branch
- No
Our Certifications, Standards & Industry Recognition
-
Product Certification
- CE
FAQ
- What is your terms of packing?
- Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
- What is your terms of payment?
- By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
- What is your terms of delivery?
- Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
- How about your delivery time?
- Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
- Can you produce according to the technical drawings?
- Yes, we can produce by your technical drawings or requirements. We can make drawings for you.
- How do you make our business long-term and good relationship?
- We keep good quality and competitive price to ensure our customers benefit. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Send your message to this supplier
People who viewed this also viewed
-
US$5,000.00-20,000.00 / Set
-
US$5,000.00-20,000.00 / Set
-
US$5,000.00-20,000.00 / Set
-
US$5,000.00-6,500.00 / Set
Find Similar Products By Category
- Supplier Homepage
- Products
- Preparation Station
- Wld-PS-C3 Prep Station/Preparation Station/Preparation Bay for Car Refinish
Related Categories
Hot Searches
- Car Equipment
- Auto Car Accessories
- Car Auto Accessory Factories
- Auto Maintenance Equipment
- Spray Paint Booth Equipment
- Used Spray Paint Booth
- Auto Spray Booth Car Painting
- Spray Booth Room Factories
- Auto Painting Spray Booth
- Prep Station Bulkbuy