• 2022 Painting Line for Sheet Metal/Powder Coating Line Supplier
  • 2022 Painting Line for Sheet Metal/Powder Coating Line Supplier
  • 2022 Painting Line for Sheet Metal/Powder Coating Line Supplier
  • 2022 Painting Line for Sheet Metal/Powder Coating Line Supplier
  • 2022 Painting Line for Sheet Metal/Powder Coating Line Supplier
  • 2022 Painting Line for Sheet Metal/Powder Coating Line Supplier

2022 Painting Line for Sheet Metal/Powder Coating Line Supplier

After-sales Service: After Sales Service and Others
Warranty: 12months
Type: Coating Production Line
Coating: Powder Coating
Substrate: Steel
Certification: CE
Customization:
Diamond Member Since 2009

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
WE
Condition
New
Voltage
380V/415V/220V/3pH/50Hz/60Hz
Color Choice
White/Bule
Heating Type
Diesel Burner/Natural Gas/LGP/Infrared Lamp
Port of Loading
Guangzhou/Shenzhen Port
Application
Metal Coating etc
Working Type
Automatic
Raw Material
Electrostatic Powder
Transport Package
Export Standard
Specification
Customized
Trademark
WLD
Origin
Guangzhou, China
HS Code
8419899090
Production Capacity
100 Sets Per Year

Product Description

2022 Painting Line For Sheet Metal/Powder Coating Line Supplier
The whole plant include 

powde coating booth with cyclone
powder curing oven 
electrostatic powder spray gun 
reciprocator with automatic spray gun 
powder sieving machines 

1. Design Principles:

Powder Coating Object:
Items: metal bed frame. Max length: 2.5m; Max weight: 15kgs/piece.
2. Powder Coating Method: Automatic Powder Coating + Manual;
3. Curing Oven: Diesel Type Heating,
4. Workshop Area: 50000×40000×9000mm(L×W×H)


2. Production Procedure:

Work Piece Loading → Automatic + Manual Powder Coating → Powder Curing (20 minutes, 180~200ºC) → Unloading

3. Powder Coating Conveyor Speed:

1. Conveyer Type: Suspension Conveyer Chain System
2. Production Line Working Speed: 1.5m/min (adjustable 0-4m/min),

(Conveyor speed adjustable by inverter 1.5 m/min);
3. 3. Coating Curing Time: 18-20 minutes, Curing Tunnel total length 30 meters.



4. Powder Coating Plant Components (see supplied DWG)

1. Powder Coating Curing Tunnel 1 Set
2. Heat exchanger system 1 Set
3. Spraying Booth with powder sieve machine
1 Set
4. Six Filters Recycle System 2Sets
5. COLO-800D-L2-B Manual Electrostatic Powder Coating Guns with Control 2 Sets
6. Auto Electrostatic Spray Guns with Control 8 Sets
7. COLO-2000D Reciprocators 2 Sets
8. Suspension Type Conveyor Line with Drive 1 Set
9. 9. Electronic Control System 1 Set

Powder Coating Production line includes:

1. Pre-treatment system : Automatical Spraying pre-treatment and dipping pre-treatment are available;

2. Drying oven : Drying oven which drying the water after pre-treatment is designed according to
custmoer actual conditions.

3. Powder coating spray system: Auotmatic spray reciprocator, Maunal spray equipment and Semi-
auto (Auto-spraying with manual reparing spraying) are for your choice;

4. Powder recycling system: Cyclone equipment and cartritdge filters is customized and introduced
according to actual requirement by customer;

5. Curing oven : Tunnel curing oven, bridge type curing oven, Electric power heating curing oven,
Gas-heating curing oven, Diesel heating curing oven, High temperature, lower temperature curing
oven is available for fitting your sole factory.

6. Conveying system: Various design according to different requirement by customer on the basis of
customers' workpiece and output information.

2022 Painting Line for Sheet Metal/Powder Coating Line Supplier2022 Painting Line for Sheet Metal/Powder Coating Line Supplier2022 Painting Line for Sheet Metal/Powder Coating Line Supplier
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now