Customization: | Available |
---|---|
After-sales Service: | After Sales Service and Others |
Warranty: | 12months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
WLD-Y90AU China Factory High Quality Auto Painting Spray Booth Price for Australia/New Zealand
Our factory carry a selection of auto paint spray booth equipment, including full downdraft booths, semi downdraft, side downdraft, and crossdraft booths. This is by far the best type of booth you can have because it is the most efficient and it is extremely clean. We have rich experience to produce CE standard, Australian standard and New Zealand standard paint booths to meet your requirements.
The spraying / baking booth is consisted of spraying / baking room and produce machine of hot wind.
When normal spraying, the main fan inhale fresh air from intake window , pass the first filter net, big dust will be disposed off then they will be send into the gas room which is at the top of spraying/baking booth. After going through the ceiling filter, the air will flow downward from the top, then go through the basement from the basement and floor to drain out. The spraying/baking booth has been keeping positive pressure to stop outside dust coming in. | When it is baking, the automatic burner will be ignited and the temperature rises. The cool air which is inhaled by the main fan will go through heat exchanger and cool air turns hot. At same time, electrical damper should be on the baking position; the hot air enters baking room and go back to the ceiling again from the basement. In this way, temperature has been rising all the time. When the temperature in baking room reaches at the setting temperature, it will automatically preserve this temperature. |
![]() |
![]() |
Specification for WLD-Y90AU China Factory High Quality Auto Painting Spray Booth Price for Australia/New Zealand:
Internal Size | L6900×W3900×H2700(mm) | |
External Size | L7000×W4000+1420×H3450(mm) | |
Room Body | Wall Panel | 50mm thickness, sandwich panel, filled with flame retardant foam foam density18kg/m³, 0.476mm colorful steel skin board. |
Roof Panel | air chamber 450mm high, galvanized steel roof panel | |
Basement | 300mm high, galvanized steel sheet and square steel pipe construction. 2 rows of grids, 3 rows of checker plates, full ramp |
|
Door | Front Door | 3-folder structure luxury front door galvanized steel sheet thickness: 0.8mm with powder coating treatment, size: W3000×H2650(mm) with tempered glass windows |
Service Door | 1pc, made of wall panelwith pressure lock & absovation windows, | |
Air Circulation System | Intake Fan | 1 set of 7.5KW direct drive turbo fan, air flow 25000m³/h |
Exhaust Fan | 1 set of 5.5KW direct drive turbo fan | |
Air Duct | galvanized steel sheet, 5pcs straights 750×750×1000(mm), 2pc 90° elbows and 2pc 45° elbows | |
Heating System | Burner | Italy RIELLO RG5S diesel burner, 260000Kcal/h, heating time 5-7min(20ºC-60ºC) Max. temperature 80ºC, fuel consumption 4-5kg/vehicle |
with oil tank & oil tank stand | ||
Chimeny | 4pcs straights and 2pcs of elblows | |
Heat Exchanger | made of 1.5mm stainless steel, exchange rate can reach 85%. | |
Filtering System | white pocket filter, ceiling filter, floor filter, active carbon pocket filter | |
Lighting System | Ceiling Light | 32pcs of 24W LED lamp tubes |
Side Light | 32pcs of 9W LED lamp tubes | |
Control System | Damper | BELIMO 20N electric damper |
Control box | Electronic control panel. Cabinet type, standard control system, easy to control and maintain. Painting, drying, lighting, painting time and drying time setting ;emergency stop switch, failure indication, over-temperature alarm indication etc. |
Q1. What is your terms of packing?
A: Generally, we pack our goods by thicker bubble paper, some of them are packed by carton.
Q2. What is your terms of payment?
A: By T/T, 30% as deposit for production, and 70% balance before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: Normally our quotation is under FOB Guangzhou, but we also accept EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving full payment. If your voltage is different from 380V/3PH/50Hz, the delivery time will be around 20 days for custom-made motors or electric components.
Q5. Can you produce according to the technical drawings?
A: Yes, we can produce by your technical drawings or requirements. We can make drawings for you.
Q6: How do you make our business long-term and good relationship?
A1. We keep good quality and competitive price to ensure our customers benefit ;
A2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.